Engineering Change Order (ECO) Coordinator/Drafter II Job at FEI-Zyfer, Garden Grove, CA

OXZPNkRKSHU1L1B5bmFMWHc1RFQ5YW9zT2c9PQ==
  • FEI-Zyfer
  • Garden Grove, CA

Job Description

Brief Description of Job Duties:

Under limited supervision, perform standard drafting assignments based on work orders provided. Make adjustments in drawings or specifications. Prepare working plans, detailed drawings, and complete mechanical or electrical drawings for components and assemblies. Works from notes, verbal instructions, and rough or detailed sketches for engineering or manufacturing purposes. Verify completed work and check dimensions, materials to be used, and quantities.

Primary duties include, but are not limited to:  

  • Engineering Change Control Coordinator - Manage engineering changes (ECO) through the approval and release cycle using an online system. Duties also include chairing the weekly Change Control Board (CCB) meeting.
  • Drafting duties - Create Assemblies and Fabrication drawings (light to medium complexity) using SolidWorks and AutoCAD software.
  • Check drawings and BOM’s for correctness
  • Perform other duties as assigned. 

JOB REQUIREMENTS

The applicant MUST have the following qualifications:

  • High School Diploma or equivalent (GED) combined with relevant on-the-job experience.
  • 3 to 5 years of experience in a CAD drafting environment using PLM systems.
  • 3 to 5 years of experience creating assembly drawings, fabrication drawings, Bills of Materials (BOM), and Engineering Change Orders (ECO).
  • 3 to 5 years of experience in CAD drafting environment working to the drafting room standard manual.
  • 3 to 5 years of experience working with 3D CAD drafting tools
  • Excellent oral and written communication skills with the ability to collaborate effectively with engineers, the manufacturing team, and cross-functional stakeholders.
  • U.S. citizenship is required.

Mental Qualifications:

  • Ability to interpret and visualize complex technical drawings and blueprints.
  • Strong attention to detail and spatial reasoning skills.
  • Proficient in problem-solving and critical thinking.
  • Capable of managing multiple projects and meeting deadlines.
  • Comfortable working independently and collaboratively with engineers.
  • Competency in using CAD software and other design tools.

Physical Qualifications:

  • Ability to sit at a desk or workstation for extended periods.
  • Manual dexterity sufficient for operating computer equipment and drafting tools.
  • Clear vision (with or without corrective lenses) for close-up design and reading technical documents.
  • Occasionally, may be required to walk through our manufacturing environment.


Additional Desirable Experience:

  • Strong organizational skills and attention to detail, ensuring accuracy, consistency, and efficiency in both computer-based and administrative tasks.
  • Experience using AutoCAD software to create, modify, and maintain technical drawings and engineering documentation.
  • Familiarity with Arena PLM/Empower systems for managing product lifecycle data, engineering changes, and documentation.
  • Knowledge of IPC standards and their application to engineering drawings, documentation, and manufacturing processes.
  • Experience working in a drafting room environment with an understanding of drafting standards, procedures, and best practices.

 

Please note this job description is not designed to cover or contain a comprehensive listing of activities, duties or responsibilities that are required of the employee for this job. Duties, responsibilities, and activities may change at any time with or without notice.

*Placement in pay range depends on: years of relevant CAD drafting experience, 3D drafting tools experience, any of the additional desirable experiences such as knowledge of IPC standards, etc.

 

Compensation details: 65000-75000 Yearly Salary

PId350a7399955-30492-40869616

Job Tags

Full time

Similar Jobs

Afton House Inn

Banquet Bartender Job at Afton House Inn

 ...inspired aesthetic while providing guests with the convenience of private bathrooms and in-room entertainment. Deluxe rooms feature whirlpool tubs and outdoor balconies overlooking the St. Croix River. St. Croix River Cruises depart from your balcony view. Treat yourself... 

Blackout Baking Co

Barista Job at Blackout Baking Co

 ...Barista Position Job Details Level: Mid Location: Blackout Baking Co. Bakery/Coffee Shop - Oak Park, IL Position Type: Part-Time Job Shift: 7am-4:30pm Friday/Saturday Job Category: Food Service Compensation: Hourly (Based on Experience) plus tips... 

Domino's Franchise

Delivery Driver- UNCC Domino's Job at Domino's Franchise

 ...Prairie Pizza is a family-owned Domino's franchise based out of Charlotte, NC. Our three basic principles are Golden Rule,Teamwork, andEnthusiasm . We pride ourselves on being the #1 pizza brand in the Charlotte and Raleigh markets. Our employees love working... 

Calvary Freight Line LLC

Class A Regional Truck Driver Job Job at Calvary Freight Line LLC

Class A Regional Truck Driver JobLooking for three regional drivers.Average 10 days out then 2 days off at home in Colorado.Must be all weather drivers with over 3 years experience. We will guarantee3000 miles per week and be driving not sitting while gone from home... 

Confidential

Production Supervisor Job at Confidential

 ...Production Supervisor Bellefontaine, OH Competitive base salary + bonus potential, supplemental pay and benefits! SHIFTS AVAILABLE: 2nd Shift: Monday-Friday 3-11pm 12-hour PM Shift: 2/2/3 schedule working nights from 7pm-7am, including every other weekend...